The Pingree, ND transload site is a 12 acre gravel lot previously used as a distribution center for wind turbine components. The developed lot has direct access to 1,300 ft of track space. There is also over 10,000 feet of available track capable of staging railcars for loading/unloading. The Pingree site has direct access to ND HWY 281 and is roughly 20 miles north of Interstate 94.